Skip to content

. Finishing course

In light of the noticeable decline in training courses in the market. And not only low value and interest to you. But it extended to the presence of errors in the implementation stages of the items and the assets of the industry (catastrophic errors) 😭. In light of the global trend of distance learning, it has become necessary for us to have an effective and influential role in providing civil and architectural engineering courses that you may need in the distance education system (online). And to support our parallel education to develop the level of engineers and supervisors. We decided to do the finishing course, by God’s grace, in which I will participate as teaching assistants who lecture at the American University and Egyptian universities. Project managers and owners of construction companies that have weight in the construction market participated in it. This is not many engineers from the Arab world.

81 lessons 1 free to watch Eng. Omar Abdullah
1500 EGP 3000 EGP
Log in to subscribe

No account yet? Create one in a minute

. Finishing course

Course lessons

81 lessons
  1. 01

    diploma of Finishes, Marketing and Decoration and Saving

    Free
  2. 02

    . Welcome video

  3. 03

    plan types and sizes.

  4. 04

    First session : Building works item

  5. 05

    The second lecture: Building works item

  6. 06

    The third lecture: Building works item.

  7. 07

    Fourth lecture: Building works item.

  8. 08

    Fifth lecture: Building works item is practical from the site.

  9. 09

    In just half an hour, the entire building works item (practical from the site)

  10. 10

    . The first lecture: the plaster item

  11. 11

    The second lecture: the plaster work item

  12. 12

    The third lecture: Implementation and receipt of the plaster work item.

  13. 13

    Fourth lecture: How to receive the plaster of the external facades.

  14. 14

    Fifth lecture: Mona Blanco.

  15. 15

    Sixth session : My work on squaring and squaring from the site

  16. 16

    The first lecture: the plumbing work item.

  17. 17

    The second lecture: the plumbing work item.

  18. 18

    The third lecture: Implementation and receipt of the plumbing work item.

  19. 19

    Fourth lecture: Drainage works and water tanks.

  20. 20

    Fifth lecture: Problems and defects during the implementation of plumbing work.

  21. 21

    The first lecture: the item of electrical works.

  22. 22

    The second lecture: The second part of the specifications and raw materials of the electrical works item.

  23. 23

    The third lecture: Implementation of the electrical works item

  24. 24

    Fourth lecture: Implementation and receipt of electrical works

  25. 25

    Fifth lecture: Receipt of the electrical works item.

  26. 26

    Sessoin Six: How to know the original wire from the damaged wire

  27. 27

    Installation work item: gypsum board work

  28. 28

    Installation works item: Suspended ceilings works

  29. 29

    Gypsum board renovation item (shadow gab and ceramic)

  30. 30

    Item of installation work: Alumetal and UPVC

  31. 31

    Installation work item: Cladding cardboard, GRC, GRG and GRP.

  32. 32

    Fixtures work item: Crital iron.

  33. 33

    Installation work item: glass bricks and CNC.

  34. 34

    Installation work item: Door, window and wooden cladding (first lecture)

  35. 35

    Fixtures work item: door, window and wooden cladding (Second lecture)

  36. 36

    Fixtures work item: Door and window (third lecture).

  37. 37

    Installation work item: Painting wooden doors and windows (fourth and last lecture)

  38. 38

    Item of installation works : wooden and parquet floors

  39. 39

    . HDF works

  40. 40

    artificial stone works

  41. 41

    Cement paint works for destinations.

  42. 42

    The work of gypsum cornices.

  43. 43

    Cladding works: mosaic, porcelain and ceramic tiles

  44. 44

    Cladding work item: inventory of tiles, ceramics and marble quantities

  45. 45

    Cladding works: implementation and receipt of ceramics and porcelain

  46. 46

    Cladding work item: problems and defects during the implementation of porcelain and ceramics

  47. 47

    Cladding work item: the difference between marble, granite and korean.

  48. 48

    Cladding works item: steps of implementing and receiving marble and granite

  49. 49

    Cladding work item: mechanical marble, marble staircase installment method

  50. 50

    Cladding works item: Marble basins and random marble

  51. 51

    Epoxy floors, tiles and Alcanaltex

  52. 52

    Paint works item: item specifications and raw materials

  53. 53

    . Paints work item: color theory

  54. 54

    Painting works item: Executing and receiving painting worK . s

  55. 55

    Painting works item: How to make . decorations and methods of calculating them

  56. 56

    Painting work item: method of installing posters and wallpape .r

  57. 57

    Landscaping and swimming pools works

  58. 58

    The first session on the work of insulation.

  59. 59

    The second session on insulation, cement insulation, foam insulation, foam concrete and glass wool.

  60. 60

    (the third session: Cement insulation (from the practical site

  61. 61

    closing session

  62. 62

    Important notes 1: Destinations and scaffolding.

  63. 63

    Important notes 2 : during the implementation of the ceramic works item.

  64. 64

    Important notes 3 : Restoration and strengthening of ceilings

  65. 65

    4 important notes

  66. 66

    Important notes 5

  67. 67

    Air conditioning work item.

  68. 68

    Important lectures 6 update.

  69. 69

    The correct way to open a duplex slab

  70. 70

    Lecture on wooden binding and track light (important lectures 7)

  71. 71

    Important session 8: The wind system and the hidden sole.

  72. 72

    Central heating works item

  73. 73

    Kitchen Business Item sesson 1

  74. 74

    sessione 2: Kitchen works, types of kitchens, furnishings and furniture.

  75. 75

    Session 3, Kitchen Work Item (Mistakes)

  76. 76

    Tricks and notes from visiting sites in the Fifth Settlement (Part One)

  77. 77

    Tricks and notes from visiting sites in the Fifth Settlement (Part Two)

  78. 78

    Awareness lecture for business owners and finishing offices.

  79. 79

    Helicopter concrete works

  80. 80

    Session on marble polishing, fountainsto explain , and into terior and exterior staircases

  81. 81

    Steps for creating a porcelain waterwheel using the new Kerabox material